When
- Aug 14, 2026 8:00 AM – 2:00 PM CT
On Friday, August 14, 2026, Sewerage and Water Board of New Orleans (SWBNO) contractor, Hard Rock Construction, will be performing a closure which will temporarily disrupt your water services. This closure is part of the Southeast Louisiana Urban Flood Control (SELA) drainage improvement project.
WHEN: Friday, August 14, 2026, from 8:00AM – 2:00PM
WHERE:
- Indiana St from Amazon St to Memorial Park Dr
- Amazon St from Georgia St to Indiana St
When water is restored, run your faucets for 5 minutes to flush out the lines before resuming regular use.
If water is not restored within one hour after end time, please contact us at the email/phone number
below.
Gauges will be placed and monitored by a SWBNO crew during the water valve closure. The procedure will be aborted, and the closure opened immediately if there are any unacceptable pressure losses during the closure or if any pressure gauge readings fall to 30psi.
If you are outside of the expected impact area and experience low or no water pressure to report a water or sewer emergency anytime – call 504-52-WATER, choose your language option and press 1 for emergency.
We appreciate your patience as we work to improve your water system.
QUESTIONS: SWBNO Community Outreach 504-585-2232 or outreach@swbno.org